Tamil Nadu Solar Net Metering Policy 2026: How It Works

Short answer: yes, Tamil Nadu has net metering for rooftop solar. TNPDCL (TNEB) replaces your meter with a bi-directional net meter that records units you import from the grid and units your system exports. You pay mainly for the difference, so daytime solar export covers night-time use. Your system size generally cannot exceed your sanctioned load, and how leftover export units are settled is set by TNERC rules. Homes that net-meter also get the up to ₹1 lakh subsidy if eligible.
Rules summarised as of October 2026. Net metering terms are set by the Tamil Nadu Electricity Regulatory Commission (TNERC) and can change; check the current order or ask us before you install.
Net Metering in Tamil Nadu at a Glance
| Point | How it works for homes |
|---|---|
| Who installs the meter | TNPDCL (TNEB) section office |
| Meter type | Bi-directional net meter |
| What is billed | Import minus export (net units), plus fixed charges |
| Capacity limit | Generally up to your sanctioned load |
| Approval | Feasibility check, then inspection after installation |
| Typical time | 2 - 6 weeks after installation |
| Rules set by | TNERC (Tamil Nadu Electricity Regulatory Commission) |
| Subsidy | PM Surya Ghar + TN top-up for eligible domestic homes |
How Net Metering Works Day to Day
| Time | What happens |
|---|---|
| Morning to afternoon | Solar powers your home; extra units export to the grid |
| Evening and night | Your home imports from the grid |
| Billing cycle (two months) | TNPDCL reads import and export; you pay for net units |
Example: in two months your home uses 700 units. Your 3kW system makes 800 units: 350 used directly in the day, 450 exported. At night you import 350. Net billed units: 350 import minus 450 export = 0 (plus fixed charges). The extra export is credited as per current rules.
Read the bill properly: how to read your TNEB solar bill. Estimate your bill with and without solar: TNEB EB bill calculator.
Capacity Rules: How Big Can Your System Be?
- Solar capacity is generally limited to your sanctioned load (shown on your EB card or bill).
- Want a bigger system? Apply for a load increase before or with the solar application.
- Large systems often need a three-phase connection. See single phase to 3-phase upgrade.
- For the subsidy, the central amount is capped at the 3kW level (₹78,000), so size to your bill, not the maximum allowed.
Leftover Units: What Happens to Extra Export?
If your system exports more than you import over a period, the surplus is handled under the TNERC settlement rule in force. These rules have been revised over the years, so we do not quote a fixed rate here. What matters for planning:
- Size your system to your use, not far beyond it. Big surpluses add little value.
- Check the export and net units on each bill.
- Ask your installer to explain the current settlement before signing.
The Net Metering Process in Tamil Nadu
- Apply on the PM Surya Ghar portal or TNPDCL's Unified Solar Rooftop Portal (USRP) with your consumer number. See TNEB solar application: how to apply and check status.
- Feasibility approval by the section office (load, dues, transformer capacity).
- Installation by a registered vendor.
- Work completion upload and net meter agreement.
- Inspection and net meter fixing by TNPDCL.
- Commissioning, then the subsidy is credited.
Detailed local steps: how to get a TNEB net meter in Cuddalore. Waiting for the meter? A zero export device lets you use solar for your own load meanwhile.
Net Metering vs Other Options
| Option | What it means | Who it suits |
|---|---|---|
| Net metering | Import and export netted on one meter | Most homes |
| Gross metering | All solar sold to the grid at a fixed rate, all use bought | Rare for homes |
| Group / virtual net metering | One system's units credited to several connections | Some apartment and institutional cases; check current TNERC provisions |
| Zero export | No export; solar used only inside the building | Before net meter, or where export is not allowed |
Apartment associations can use common-area solar with net metering on the common connection: solar for apartments: RWA subsidy guide.
Commercial Connections
Shops, offices and factories can also install rooftop solar, but the metering arrangement and charges for non-domestic consumers follow separate TNERC provisions, which have been revised and debated. Check the current order for your tariff before investing; we work it out from your bills. See solar for shops and small businesses.
Before You Sign: Net Metering Checklist
- Check your sanctioned load and plan any load increase.
- Clear any pending EB dues on the connection.
- Make sure the EB bill name matches your Aadhaar and bank account.
- Ask your installer to explain the current settlement rule for surplus units.
Frequently Asked Questions
Is net metering available in Tamil Nadu?
How does net metering work on a TNEB bill?
What happens to extra solar units at the end of the year?
What is the maximum solar capacity I can install under net metering?
How long does it take to get a net meter in Tamil Nadu?
We Handle Your Net Meter
From the application to TNPDCL inspection and net meter fixing, our team handles every step and explains your first solar bill. Registered PM Surya Ghar vendor serving Cuddalore, Puducherry and nearby towns. Call or WhatsApp +91 7904369094.
Get a Free Rooftop Assessment
Our engineers will visit your site, analyze shadow-free area, and provide a detailed solar report.
Book Free AssessmentTags
Ready to Switch to Solar?
Get a customized solar solution for your home. Save up to 90% on electricity bills!
- Free Site Visit
- Govt. Subsidy Support
- 25 Years Warranty